20.70.060 DD-01 – Dedication of public improvement standards.
This dedication of public improvement standards (DD) section applies to the following types of development:
ST CS CM IP
A. Cross Reference. See JCC 20.70.250, SY-01 – Surety standards, for standards relating to public improvements.
B. Dedication of Right-of-Way. All right-of-way on an approved final plat shall be considered dedicated upon its approval. Improvements within the right-of-way shall be subject to the surety standards in JCC 20.70.250 SY-01 – Surety standards.
C. Dedication of Streets. The intent of the County is to take ownership of all improvements within the right-of-way if the following criterion is met:
1. Construction Standards. All improvements have been constructed as per the County’s engineering and construction standards.
D. Dedication of Other Facilities. Other infrastructure or facilities may, at the election of the County Commissioners, be dedicated to the County. These facilities may include parks, open space, retention ponds, drainage facilities, utilities, street lighting, or other facilities that the County may have interest in. If dedicated and accepted, the operation and maintenance costs shall be transferred to the County. A three (3)-year maintenance surety for any improvement may be required by the County at the time of dedication. [Ord. 12-27-11 § 7.06.]